FAI Engineers is very pleased with the fact that we have had a continuing association with SFASU over the years, not only working for Architects on various projects, but also with an indefinite delivery contract (IDC) for engineering services since 1987.

Services provided to SFA as part of this contract include:

  • Assist with project evaluation, feasibility, and scope of various projects;
  • Obtain required documents (drawings, as-builts, outline specifications, etc.);
  • Assist in preparation of bidding forms, conditions of contracts, etc.;
  • Furnish necessary copies of plans, specifications, notice to bidders, and proposal forms required for bidding;
  • Conduct periodic site visits to monitor progress and assure compliance with the construction documents;
  • Prepare and furnish record drawings;
  • Provide financial feasibility, appraisals, rate studies or other special economic studies;
  • Provide master planning surveys, and
  • Prepare measured drawings of existing construction when required for planning additions or renovations.

Most recent projects completed by our firm under this contract are as follows:

Hall 15 & 18 New Chilled Water Piping
Location: Nacogdoches, Texas
Building Sq. Ft.: N/A
Completion Date: February 2013
Final Construction Cost: $218,850
 
Hall 15 & 18 New Chilled Water Piping

Project was for connecting two existing chiller plants to allow more effective use of energy efficiency equipment.

Type of Professional Services Provided: Site investigation of existing conditions, design development, cost estimate, construction documents, bid evaluation, submittal review, and construction administration.


Human Sciences North and Forestry Buildings New Chillers
Location: Nacogdoches, Texas
Building Sq. Ft.: N/A
Completion Date: June 2012
Final Construction Cost: $203,300
 
Hall 15 & 18 New Chilled Water Piping

Project was for the replacement of existing chillers with new high efficiency chillers with slight modification to existing chilled water piping to ensure more efficient flow/pumping.

Type of Professional Services Provided: Site investigation of existing conditions, design development, cost estimate, construction documents, and construction administration.


Forestry Building New Boilers
Location: Nacogdoches, Texas
Building Sq. Ft.: N/A
Completion Date: May 2013
Final Construction Cost: $75,300
 
Forestry Building New Boilers

Project was for replacement of existing boilers with new high efficiency boilers including flues, heating water pump with VFD, expansion tank, by-pass feeder, associated required new sections of heating water piping, make-up water piping, gas piping, and electrical power.

Type of Professional Services Provided: Site investigation of existing conditions, design development, cost estimate, construction documents, and construction administration.


Power Plant No. 2 South Loop Piping Replacement
Location: Nacogdoches, Texas
Building Sq. Ft.:
Completion Date: September 2010
Final Construction Cost: $917,210
 
Power Plant No. 2 South Loop Piping Replacement

Project was for the replacement of a deteriorated section of underground piping serving academic building connections to Power Plant No. 2. New piping was partially installed on top of the existing pipe lines that had to remain in service until new piping could be completed. This section of the piping serves seven (7) buildings.

Contract Delivery Method: Competitive bid

Type of Services: Site investigation, analysis/study of existing conditions, design development, cost estimate, construction documents, bid evaluation, submittal review, and construction administration.

Est. Budget Construction Cost: $900,000

Accepted Low Bid: $887,815

Final Construction Cost with Change Orders: $917,210

Type of Construction: Renovation

NTP for Engineer: Original study was conducted in the 1st quarter 2009; design started August 2009, design completed October 2009.

NTP for Contractor: February 2010.

Substantial Completion Date: September 16, 2010


Health and Physical Education Building Indoor Pool Renovation
Location: Nacogdoches, Texas
Building Sq. Ft.:
Completion Date: August 2009
Final Construction Cost: $154,875
 
Health and Physical Education Building Indoor Pool Renovation

This project was for the design and layout of pool filters, piping, valves, pumps, water treatment equipment, pool drains, and water balancing the tank for the renovation of the existing pool. Friberg Associates Inc. worked in conjunction with a selected contractor and the work was done in a very short amount of time between first semester break and the starting of the fall semester.

Contract Delivery Method: The owner issued a change order to an existing on-going contract.

Type of Services: Project analysis, site investigation of existing conditions, design development, construction documents, and construction administration.

Est. Budget Construction Cost: $200,000

Original Construction Contract: $151,950

Final Construction Cost with Change Orders: $154,875

Type of Construction: Renovation

NTP for Engineer: April 9, 2009

NTP for Contractor: July 2, 2009

Substantial Completion Date: August 24, 2009


Homer Bryce Stadium Lighting
Location: Nacogdoches, Texas
Building Sq. Ft.:
Completion Date: September 2010
Final Construction Cost:
 
Homer Bryce Stadium Lighting

This project was for replacement of wiring to the existing light fixtures and stadium light poles. Work also included two (2) feeders to stadium light poles and a main circuit breaker for one of two electric switchgear panels.

Type of Services: Project analysis, site investigation of existing conditions, design development, construction documents, and construction administration.

Construction Cost: Unknown, handled directly by the Owner.

Type of Construction: Renovation

NTP for Engineer: June 1, 2010

Drawings Completed: July 12, 2010

NTP for Contractor: July 2010

Construction Completed: September 2010


ADDITIONAL PROJECTS UNDER THIS IDC:

Air and Water Balance at the Early Childhood Research Center

Addition of the University President’s house

Northeast Loop Primary/Switchgear Replacement and Upgrade

Study to rework the Sesquicentennial monument fountain

Expansion of Power Plant No.2 which serves many buildings on campus. The expansion included new boilers, addition of (2) 2,000 tons of refrigeration, large campus loop pumps, cooling towers and electrical work.

Served as ad hoc member of a committee to select an Energy Services company.

Evaluation of existing HVAC and electrical equipment to allow SFASU to complete their budget request to the state legislature.

Renovation of the air conditioning serving a two room suite of offices in the Administration Building.